Biomass Power Plant

POWER AID MIE Shin-Biomass™ Matsusaka power plant
Rendering

Location: Matsusaka City, Mie
Maximum output: 1.99MW
Expected annual power generation: around 16,470 MWh
*Equivalent to annual power consumption of approx. 3,400 average households
Start of electricity sales: Jan. 2025 (scheduled)
Features: Uses waste mushroom beds (spent medium) discharged from the Mie Mushroom Center of Hokuto Co., Ltd. located in Taki Town, Mie Prefecture, recycled wood chips and plastic resources discharged from neighboring areas of the Chubu region

Biomass Power Technologies Matsusaka woody biomass power plant
右画像

Location : Matsusaka City, Mie
Maximum output : 1.99MW *Generating-end output basis
Expected annual power generation : around 13,940MWh
*Equivalent to annual power consumption of approx. 2,760 average households
Start of electricity sales : Jan. 2018
Features : Uses waste from nearby existing biomass power plants such as tree barks

Biogas Power Plant

Hamura Biogas Power Plant
右画像

Location : Hamura City, Tokyo
Maximum output : 1.1MW
Maximum amount of waste processed : 80tons per day
Expected annual power generation : around 8,500MWh
*Equivalent to annual power consumption of approx. 1,740 average households
Start of operation : Dec. 2020 (Estimated)
Features : Uses waste from food related business operators such as food manufactures,etc.
JAIC also invests in Nishi Tokyo Recycle Center, an operator of the power plant

Nishi Tokyo Recycle Center Co., Ltd.
logo mark

Location of head plant : Hamura City, Tokyo
Representative : Tetsuya Ueda
Incorporation : Jul. 2015
Business : Engages in the food recycle business to recycle food waste to produce renewable energy.
Receives food waste from food manufacturers and other food related business operators for compensation, reduces the volume of food waste by about 80% by methane fermentation, and generates biogas (methane gas) in the process.

business scheme of food waste recycling

Aomori Touhokumachi Power Plant
右画像

Location : Touhoku-machi, Kamikita-gun, Aomori
Maximum output : 0.03MW
Expected annual power generation: around 0.16MWh
*Equivalent to annual power consumption of approx. 33 average households
Start of operation : Nov. 2018
Features : Driven by biogas, which is generated by methane fermentation of the discarded sections (residue) of ‘nagaimo’ yam

Solar power systems with storage batteries installed on the rooftops

Location : Koshigaya City, Saitama/ Hidaka City, Saitama /Atsugi City, Kanagawa
Maximum output : 1.2MW in total
Expected annual power generation: around 1,230MWh in total
Start of operation : Dec. 2022 - Feb. 2023
Features :
- KIC Holdings Inc., one of the strategic investees, developed these distribution centers. Smart Solar, also one of the strategic investees, developed these solar power systems with storage batteries.
- Combined and efficient operation of solar panels installed on the rooftop, storage batteries, and commercial power sources
- This is the result of successful collaboration between strategic investee companies.

Mega Solar Power Plant

Karasuyama Nakayama Solar Power Plant
右画像

Location: Nasu-Karasuyama City, Tochigi
Maximum output: 2.1MW
Expected annual power generation: around 2,630MWh
*Equivalent to annual power consumption of approx. 560 average households
Start of operation: March 2024
Features: Procured project finance from Ashikaga Bank

Otawara City Kamehisa Solar Power Plant
右画像

Location: Otawara City, Tochigi
Maximum output: 2.1MW
Expected annual power generation: around 2,500MWh
*Equivalent to annual power consumption of approx. 530 average households
Start of operation: May 2024
Features: Procured project finance from Ashikaga Bank

Kanuma City Kamiishikawa Solar Power Plant
右画像

Location: Kanuma City, Tochigi
Maximum output: 2.0MW
Expected annual power generation: around 2,500MWh
*Equivalent to annual power consumption of approx. 530 average households
Start of operation: Dec. 2023
Features: Procured project finance from Ashikaga Bank

Ukiha-shi, Shirakabe Solar Power Plant, Ukiha-shi, Mizunosato Solar Power Plant, Ukiha-shi, Minou Alps Solar Power Plant
右画像

Location : Ukiha City, Fukuoka
Maximum output : 3.0MW in total
Expected annual power generation: around 3,341MWh in total
*Equivalent to annual power consumption of approx. 690 average households
Start of operation : Mar-May 2020
Features : Farm-type solar power plant. Moss Yamagata, farmer of this power plant, cultivates moss as greening material under the solar panels.

Akkeshi Luke Supor Solar Power Plant
右画像

Location : Akkeshi County, Hokkaido
Maximum output : 2.3MW
Expected annual power generation: around 2,574MWh in total
*Equivalent to annual power consumption of approx. 530 average households
Start of operation : May 2020

Hirono Solar Park
右画像

Location: Futaba County, Fukushima
Maximum output: 2.7MW
Expected annual power generation: around 3,290MWh in total
*Equivalent to annual power consumption of approx. 680 average households
Start of operation: Feb. 2020
Features: Joint investment with Smart Solar Corporation, a strategic partner company.

JAIC-Solar Fund, L.P.,II

Outline

Fund management company : JAIC Capital Partners Co., Ltd.(JAIC’s 100%subsidiary)
Fund investors :
General Partner : JAIC Capital Partners Co., Ltd.(investment ratio : 0.07%)
Limited Partners : JAIC(investment ratio : 0.07%), other 2 companies(investment ratio : 99.85%)
Date of establishment : March 4, 2020
Total commitment amount : \1,359M
Investment target : Mega solar projects in operation

Project invested : Higashioudaike solar power plant
右画像

Location : Sanuki City, Kagawa
Maximum output : 2.4MW
Expected annual power generation: around 3,010MWh in total
*Equivalent to annual power consumption of approx. 620 average households
Start of operation : Jul. 2018
Features : The fourth investment record in water float type mega solar power plant of us

Project invested : Nakaoudaike solar power plant
右画像

Location : Sauki City, Kagawa
Maximum output : 2.4MW
Expected annual power generation: around 3,060MWh in total
*Equivalent to annual power consumption of approx. 630 average households
Start of operation : Apr. 2018
Features : The third investment record in water float type mega solar power plant of us

Project invested:Iwate Ichinoseki Solar Park
右画像

Location : Ichinoseki City, Iwate
Maximum output : 2,4MW
Expected annual power generation: around 2,450MWh in total
*Equivalent to annual power consumption of approx. 510 average households
Start of operation : Jan. 2018
Features : Joint investment with Smart Solar Corporation, a strategic partner companies

Project invested: Mitakabeikesolar power plant
右画像

Location : Sanuki City, Kagawa
Maximum output : 1.52MW
Expected annual power generation: around 1,870MWh in total
*Equivalent to annual power consumption of approx. 390 average households
Start of operation : Sep. 2017
Features : The second investment record in water float type mega solar power plant of us

Project invested: Nomaike solar power plant
右画像

Location : Sanuki City, Kagawa
Maximum output : 2.4MW
Expected annual power generation : around 2,990MWh in total
*Equivalent to annual power consumption of approx. 620 average households
Start of operation : May. 2017
Features : The first investment record in water float type mega solar power plant of us

Project invested: Kumanishiki Ajioka Shizen Energy solar power plant
右画像

Location : Kuma County, Kumamoto
Maximum output : 3.1MW
Expected annual power generation : around 3,500MWh in total
*Equivalent to annual power consumption of approx. 730 average households
Start of operation : Dec. 2015
Features : Joint investment with Shizen Energy, Inc.

Note: Annual power consumption of average households are converted at 4,825kWh per annum based on the Photovoltaic Power Generation Association “Disclosure Guidelines (FY2020)“.